Cracking Data DIV. 02 · COMBUSTION

Division 02 · Permitted Combustion Register

The plant
with a deadline.

Permitted generators, boilers, CHP and standby plant in your territory — operator resolved to its registered company, thermal rating stated, permit class and status current, and a statutory emissions-testing clock read straight out of the regulator's own compliance documents.

This is the rare register where "due" isn't an opinion. On the best records, the regulator wrote the next date itself and we quote it, with the report reference and the page.

COVERAGE: 5,189 permit entries walked in full · 581 combustion permits retained
DOCUMENT LAYER: 265 permits with compliance shelves · 286 reports parsed · 133 sites with verified evidence

POW-YO-0114 VERIFIED 25 JUL 2026
Operator
██████ Panel Products Ltd[1]
Site
Oldham, OL9 ███[2]
Permit class
Medium combustion · 4 units[2]
Registered
Nov 2024[2]
Test window
FIRST TEST — closes Mar 2025[3]
Evidence
Registration only — verify[2]
Sources — [1] Companies House · [2] Environmental permit register, Jul 2026 walk · [3] Statutory periodic-measurement cycle counted from registration
↓ summary view. Scroll for a fully-evidenced record.

Why this register, now

Compliance is a calendar. Somebody has to service it.

Permitted combustion plant carries obligations that don't move: periodic emissions measurement on a fixed cycle, first tests within months of registration, and emission-limit deadlines written into law years in advance. Every one of those is a job. The operators know the dates exist; most have no idea when theirs falls, and the register does.

The trigger

Periodic emissions measurement. First test within months of registration, then on a fixed cycle — tighter for larger plant. A booked visit, on a date you can name.

The second trigger

Emission-limit deadlines. Existing plant in the lower band faces a hard date at the turn of the decade; the upper band is already live. Both mean specification work.

The third trigger

A result in the last report. An exceedance at a single emission point is a scheduled return visit and, often, a plant conversation nobody else knows to have.

The disqualifier

Where the permit shelf holds no dated evidence, the record can't claim a deadline. It's graded down and labelled as a hypothesis worth one call — not sold to you as urgent.

A record in full

The regulator's own date. Quoted.

One record from the Permitted Combustion Register, shown complete. Values are illustrative; the field structure, evidence tiers, clock logic and scoring are exactly as shipped. Note the evidence block — that's the difference between this register and a permit list.

Official stated in a statutory source or document Matched joined across sources, confidence stated Inferred derived from a named rule Modelled estimated, bounds shown

POW-LS-0037 P1 · ACT NOW TEST DUE VERIFIED

01 · Operator & site

Operator
Off███████ Coatings LtdCompanies House 0█████6 · active · 3 directors on file
Trade
OffSIC 20301 · industrial coatingsProcess heat — the plant is not optional to their output
Site
OffLincoln, LN6 ███Street address taken from the permit record, not geocoded
Permit holder
MatSame entity as operatorPermit name matched to registered company
From your base
Mod41 mi · 58 min

02 · Permitted plant

Permit ref
Off████/█████Status: Effective · checked in the Jul 2026 walk
Class
OffMedium combustion plant
Thermal input
Off12.4 MWth aggregatedStated in the compliance report, not the register listing
Units
Off3 · natural gasUnit inventory extracted from the report's plant schedule
Emission points
Off3
Limit regime
InfLimits live since Jan 2025Band derived from thermal input + registration vintage

03 · Statutory clock

Last measurement
Off12 Sep 2023Signal: CONFIRMED — date appears verbatim in the report
Next due
Offby 30 SEP 2026Stated by the regulator in the report — 64 days from build
Basis
OffReport ████, p.4Quoted verbatim on the licensed record, with the document
Last result
OffPass · 1 exceedanceEmission point 2 — return visit recorded as required
Cycle status
OffRegulator-statedNot inferred. This is the top rung of the evidence ladder.

04 · Commercial

Monitoring visit
Mod£1,500 – £3,500 (est.)Flat band — never scaled to the site's rating
Service position
Mod£12,400 – £37,200/yr (est.)Derived from the thermal band, not the exact rating
Exceedance work
ModReturn visit + remedialScope unknown from public record — priced on the call
Limit compliance
ModSpecification opportunityBurner/abatement review triggered by the live limit regime
Renewal
InfRecurring on cycleThe clock doesn't stop. Neither does the contract.
Compliance evidence block — carried on every evidenced record Report ████-██████ · assessment date 04 Oct 2023 · monitoring date 12 Sep 2023 · units 3 · emission points 3 · aggregated thermal input 12.4 MWth · result pass with one exceedance at EP2 · next submission basis stated by the regulator in-document · frequency status regulator-stated, not rule-inferred.

Every date in this block was required to appear verbatim in the source document before it was allowed onto the record. Anything that failed that check is flagged for review, not published.
Priority score — why this record is P1 86 / 100
Trigger38/40
Value22/30
Entity20/20
Contact6/10

PRIORITY FALLS IF — the operator has already booked the September measurement with an existing provider, or the plant has been derated below the threshold since the last assessment. Both are one question each, and the record tells you to ask them before you quote.

Call angle — generated per record You are ringing about a date the regulator set, not a date you invented: sixty-four days. Open with the exceedance at emission point two — it is on their file and it will not have been forgotten — then the return visit, then the wider limit position on three gas units. Ask for the person who signed the last submission.
Sources — [1] Companies House: entity, directors, SIC, status · [2] Environmental permit register: permit reference, class, status, site address and coordinates, Jul 2026 complete walk · [3] Compliance assessment report ████-██████, retrieved from the permit's own document shelf; monitoring date, next-due date, unit inventory, emission points and result extracted with verbatim validation

Illustrative composite. Field structure, evidence tiers, clock logic and scoring are as shipped.
The document layer is the product

The register listing gives you a name and a permit number. The thermal rating, the unit inventory, the monitoring dates and the result all live in a document behind it. Retrieving and reading those at scale is the work.

Verbatim or nothing

Every extracted date must appear word-for-word in its source document before it reaches a record. Failures go to human review. A machine-read value is never promoted to confirmed on its own.

Bands, not exact figures

Sealed sample pages recompute values from the thermal band rather than the exact rating, so nothing leaks before a licence. Test cost is a flat band for the same reason.

Real addresses, always

Site coordinates come from the permit record's own address and grid-reference fields. Regional labels are never geocoded to a centroid — that's how plant 40 miles outside your patch ends up in your pack.

The evidence ladder

Four rungs. Only the top one is a deadline.

Every record on this register sits on a named rung, printed on the page. The rung determines the grade — the build enforces it, so no record can be talked upward.

Rung 4

The regulator states the next due date in a document we hold. Quoted with the report reference and page. Grades P1 · ACT NOW. This is the only rung where the word "due" appears without a qualifier.

Rung 3

Permit-stated testing frequency. Held back until we have the permit condition documents to support it. We'd rather tell you a rung is empty than fill it with an assumption.

Rung 2

Confirmed last test plus the published cycle. The last measurement date is real and cited; the forward date is arithmetic. Grades P1 · VERIFY & SCHEDULE — worth a call today, described accurately.

Rung 1 / 0

A compliance shelf with no parseable dates, or a registration date only. A hypothesis, not a deadline. Capped at second or third priority regardless of how attractive the site looks.

What we sell, stated plainly Permitted combustion sites with confirmed monitoring evidence — a verified last-test position and a prioritised next likely window. Not "every operator's exact next deadline". When the permit-condition layer is in, that claim changes, and we'll say so on this page rather than quietly upgrading the language.

Where this comes from

Public register. Private effort.

The permit register is open to anyone. Reading it end to end, retrieving the documents behind each entry, extracting a plant inventory from them and validating every date against its own source is the part that isn't.

The permit register — walked in full

5,189 entries walked end to end in the latest pass, of which 581 combustion permits are retained. An earlier ceiling of 4,000 had been silently hiding 23% of the market; completeness is now a build assertion rather than a hope.

Permit ref · class · status · site address · coordinates
The document shelf

Behind each permit sits a shelf of compliance and permitting documents that the register's own search will not surface. 265 permits carry one; 286 reports have been retrieved and read; 133 sites now hold verified compliance evidence.

Monitoring dates · next-due · units · emission points · result
Statutory cycles & limits

Published measurement frequencies and emission-limit deadlines, applied as named rules with their exceptions disclosed on the record — including the reduced-hours exception that changes the answer for some sites.

First-test window · periodic cycle · limit dates
Companies House

Permit holder resolved to a registered company: status, directors, group structure, charges. A permit in the name of a dissolved entity is a different conversation, and we'd rather you knew before you dialled.

Entity · status · directors · ownership

Coverage note: England is complete. The devolved regulators publish separately and are in build — your cover sheet always states the universe it was drawn from.

On the register this week

A feed, not a file.

Permits change status, compliance reports publish, first-test windows open and close. Subscribers get their territory's changes weekly, flagged with what to do about them.

Compliance report published against a 12MWth site — regulator-stated next date extracted and validated. Record promoted from predicted to confirmed.

Complete register walk: 581 combustion permits retained, 4 no longer effective, status re-checked on every one.

Two new registrations in territory — first-test window now open on both, closing within four months of registration.

Cohort flag: 35 permits in territory now 15 years or older — overhaul-window candidates, labelled as estimates pending trade calibration.

717 stale rows pruned after the complete walk. Territory counts corrected downward, and we said so on the cover.

Territories

A smaller register. A sharper one.

There are hundreds of permitted combustion sites, not thousands — and that is the point. Every one is a named operator with a statutory obligation and a plant inventory. One licensed firm per territory.

Permitted combustion sites on register · July 2026 complete walk
TerritoryPermitted sitesWith compliance evidenceStatus
North West9624Available
Yorkshire & North East19344Available
East & West Midlands11827Available
East of England7417Available
London & South East6314Available
South West377Available
Wales, Scotland & NIIn build
England — national licence581133By enquiry

Territories overlap at the boundaries; packs are cut by radius from your depot rather than by administrative line. Counts move with each complete walk — including downward, when delisted permits are pruned.

The arithmetic

The clock resets. So does the invoice.

A single periodic emissions measurement is a four-figure visit. An annual service and compliance position on a permitted site runs into four or five figures a year, and it renews on a statutory cycle rather than a purchasing whim. Limit-compliance work on burners and abatement is a separate, larger conversation that starts from the same call.

The register hands you the sites, the ratings, the last verified test position and — where the regulator has stated it — the actual date.

One retained compliance client > twelve months of the licence, every year it renews.

Straight answers

The questions you're already asking.

Can I not just search the permit register myself?

You can, and you'll get a name, a permit number and a class. What you won't get from the search page is the thermal rating, the unit inventory, the emission points, the last monitoring date, the result, or the regulator's stated next date — because those live in documents attached to each permit, one entry at a time, several thousand entries deep.

Retrieving those, reading them, validating every extracted figure against its own text and tying the permit holder to a live registered company is the register.

Do you actually know when every site's next test is due?

No, and we won't claim it. On sites where the regulator stated the next date in a document, we quote it with the reference — that's the top rung and it's a genuine deadline. On sites with a confirmed last test but no stated next date, we count the published cycle forward and label it predicted. On sites with registration only, it's a hypothesis worth one call and it's graded accordingly.

Every record tells you which of those three it is, in those words, on the page.

How do I know the extracted figures are right?

Because every date and figure taken from a document has to appear verbatim in that document before it's allowed onto a record — the check is automated and it runs on every build. Anything that fails goes to human review rather than to you. The source document reference and page sit on the licensed record, so you can open it yourself.

Where do the cost estimates come from?

Published trade ranges, applied as bands and labelled (est.) everywhere they appear. They are tunable constants, not findings, and we're calibrating them with input from firms in the trade. Where a figure hasn't been calibrated for your sector yet, the register says "in calibration" rather than presenting a confident number.

Is Scotland, Wales or Northern Ireland covered?

Not yet on this register — the devolved regulators publish separately and each needs its own ingest. England is complete and walked end to end. Your cover sheet always states the universe your pack was drawn from, so you never have to guess whether a gap is a gap or an absence.

What does it cost?

Territory licences start at £499 a month on a six-month minimum term, priced to the size of your patch — sites on register and how many carry live evidence — and quoted with your sample pack. National licences by enquiry.

Free territory sample

See your patch first.

A sample pack for your territory within two working days, led by the verified-evidence queue: one record fully open with its compliance evidence block intact, the surrounding records sealed, and a compliance calendar for your patch — tests due within twelve months, first-test cohort, and plant carrying live limit obligations.

We use your details to send the sample and follow up once. Nothing else, no list.