Cracking Data DIV. 01 · SOLAR

Division 01 · Commercial Solar Register

Every array.
Every deadline.

Every grid-connected commercial array from 50kWp in your territory — operator named and resolved to its registered company, capacity verified against two independent sources, connection vintage dated, inverter-replacement window flagged, and the O&M incumbency checked.

Arrays connected in the 2011–2015 rush are hitting replacement age now, in a cohort, on a schedule that is published. Almost nobody in the trade is working that list.

COVERAGE: all 14 GB distribution licence areas · accreditation cohorts to 2010
REFRESH: monthly grid-register ingest, weekly filings and planning sweep

SOL-NW-0357 VERIFIED 20 JUL 2026
Operator
███████ Farms LLP[1]
Site
Ground-mount, Cheshire CW6 ███[2]
Capacity
2.4 MWp[2]
Connected
2012 · FiT cohort[3]
Inverter window
OVERDUE — yr 14[3]
Signal
Ownership change filed Mar 2026[1]
Sources — [1] Companies House, incl. PSC change Mar 2026 · [2] DNO Embedded Capacity Register, Jun 2026 · [3] Ofgem FiT accreditation register
↓ summary view. Scroll for the same record type in full.

Why this register, now

A decade of installs, all ageing at once.

The commercial rooftop boom ran on a tariff scheme with published accreditation dates. That means the entire installed base has a birthday on the public record — and inverters have a design life measured against it. The replacement cohort isn't a guess; it's a calendar. What has been missing is a register that reads it.

The trigger

Inverter design life against connection vintage — the single most reliable service trigger on a solar asset, and it's derived from public accreditation data.

The second trigger

Ownership change. New owners review supplier arrangements. Filings tell you months before the incumbent finds out.

The third trigger

Consented site expansion. A new building means new roof, and the array extension goes to whoever is already in the conversation.

The disqualifier

A private inverter swap leaves no public trace. Every record carrying an age-based signal says so, in the record. We'd rather you make the call informed.

A record in full

Cited, or it isn't in.

One record from the Commercial Solar Register, shown complete. Values are illustrative; the field structure, evidence tiers, clock logic and scoring are exactly as shipped. Your sample pack carries one record like this fully open, so you can audit it against its own sources.

Official stated in a statutory source Matched joined across sources, confidence stated Inferred derived from a named rule Modelled estimated, bounds shown

SOL-NW-0188 P1 · ACT NOW VERIFIED 26 JUL 2026

01 · Operator & site

Operator
Off██████ Logistics (North) LtdCompanies House 0█████3 · active · accounts to Dec 2025
Ownership
OffSubsidiary · EU parentPSC register — decision-maker sits outside the UK entity
Trade
OffSIC 52103 · warehousingDaytime load profile — self-consumption skews high
Site
OffTrafford Park, M17 ███Single distribution unit · full address on licensed record
Estate
Mat2 further UK sitesNeither carries a registered array — expansion prospect

02 · Asset

Capacity
Off1,240 kWpDNO Embedded Capacity Register, Jun 2026 refresh
Declared cap.
Mat1,180 kWp · Δ −4.8%High-confidence match · district + capacity ±10%. Not confirmed.
Mounting
OffRoof · 8,900 m² arrayPlanning ref █████████ with layout drawings
Energised
OffSep 2016
Inverter class
InfString · ~44 unitsRule-derived from vintage, mounting and capacity band
DNO
OffElectricity North West

03 · Service clock & signals

Asset age
Off9 yr 10 mo
Inverter window
InfOPENS 2028Signal: PREDICTED — string units, not yet due
Live trigger
OffEXTENSION CONSENTEDWarehouse extension decided May 2026 — 4,100 m² new roof
Capex signal
OffCharge registered Mar 2026Asset finance in place — the money is already sitting there
Incumbent O&M
OffNone locatedSearched provider references + award notices, Jul 2026
Next check
OffAug 2026 register refresh

04 · Commercial

Annual output
Mod1,120,000 kWh/yr (est.)Regional irradiance · 0.4%/yr degradation applied
Value at risk
Mod£109,000 – £188,000/yrLow/base/high · self-consumption 25–65%, import 22–30p
Downtime
Mod£405/day (est.)
Extension scope
Mod350 – 600 kWpFrom consented roof area and existing array density
O&M contract band
Mod£5,600 – £11,900/yr (est.)
Priority score — why this record is P1 78 / 100
Trigger30/40
Value24/30
Entity18/20
Contact6/10

PRIORITY FALLS IF — the extension consent lapses or is built without roof plant, or the array sits under a parent-level European framework that the UK entity doesn't control. Both are answerable in the first two minutes of a call, and neither is answerable from the public record.

Call angle — generated per record Not an inverter conversation. A consented 4,100 m² extension plus asset finance registered in March means someone is specifying roof plant right now, and there is no O&M incumbent to displace. Get in before the main contractor picks a preferred supplier. Ask who signs — the PSC register says it isn't the UK site manager.
Sources — [1] Companies House: filing history, PSC register, charges register, SIC · [2] DNO Embedded Capacity Register, Jun 2026 refresh · [3] Ofgem accreditation register · [4] Local planning authority ref █████████, decision May 2026, incl. layout drawings · [5] Public award notices & provider references, searched 24 Jul 2026

Illustrative composite. Field structure, evidence tiers, clock logic and scoring are as shipped.
Two sources on capacity

The grid register and the accreditation register rarely agree exactly. We print both and the delta rather than picking a winner quietly. On a 1.2MWp array a 4.8% gap is worth knowing before you quote.

The trigger isn't always age

This array is too young for a replacement pitch. It is still P1, because a consented extension and a registered finance charge are a better trigger than a birthday. Records are graded on what's actually happening.

Estate-level context

Resolving the operator to its group shows two more UK sites with no registered array. One record, three opportunities — and a warning that the decision-maker isn't in the building.

Sorted to your patch

The register is national. Your pack arrives sorted by drive distance from your depot, so the top of the list is genuinely the top of the list.

The service clock

"Due" is a strong word.
We only use it when we can prove it.

Solar has no statutory inspection cycle to lean on, which makes it very easy to invent urgency. We don't. Age-based windows are labelled PREDICTED, every one of them carries its missing-evidence line, and a record can't be promoted to top priority on age alone.

Confirmed

A dated event in a document we hold: consent decided, charge registered, ownership transferred, notice published. These drive top-priority grading.

Predicted

Accreditation vintage plus design life, with the inverter class named as an inference. Real, useful, and honestly labelled as arithmetic.

Verify

Capacity on the register but no vintage, or a join that didn't reach confidence. Kept in the register, graded down, never dressed up.

What honesty costs, and buys Applying these gates to one sample territory took the top-priority count from 50 down to 25. Half the "hot leads" a looser build would have sold you were arithmetic wearing a red flag. You get the 25, and the other 208 are still there, graded, with what would need to be true for them to move up.

Where this comes from

No secrets. Just the join.

Every source below is public. What you're buying is the join — extraction, cross-referencing, verification and upkeep across all of them. No single register tells you "arrays entering the replacement window, by operator, with nobody holding the contract". This one does.

DNO Embedded Capacity Registers

Every distribution network operator publishes its connected generation monthly — location, capacity, technology, connection date. The anchor dataset, ingested across all 14 licence areas, in full, every month.

Capacity · location · connection date
Accreditation registers

Installation-level vintages back to 2010, plus tariff terms and declared capacity. Cohort age is what turns an address into a service opportunity — inverters don't care who owns them.

Vintage · declared capacity · term end
Planning files

Applications state kWp, mounting method and roof area, often with layout drawings attached. Consents are the earliest signal an array exists — sometimes before it's built — and a new building consent is a live extension trigger.

Mounting · area · extension consents
Companies House

Operator identity, group structure, directors, PSC changes and the charges register. A registered finance charge is capex you can see. A change of owner is a change of supplier waiting to happen.

Entity · ownership · finance charges

On the register this week

A feed, not a file.

Subscribers get their territory's changes weekly, each flagged with what to do about it.

June register refresh ingested — new connections ≥50kWp added across all licence areas, capacity deltas re-checked against accreditation data.

Planning consent: 3.1 MWp ground-mount, Lancashire — construction-phase contact window now open.

14 arrays entered the year-12 window this month. Cohort flagged, each with its missing-evidence line.

Ownership change filed against an operator holding two registered arrays — supplier-review signal raised on both.

Repair queue: 65 records with implausible connection dates quarantined pending source re-check. Never sampled into a pack.

Territories

One firm per patch.

Exclusive means exclusive: one licensed firm per territory, for this register. When a territory is taken, it is closed, and the next enquirer is told it's closed.

The register itself is national. Records are delivered sorted by drive distance from your base postcode, or filtered to the exact areas you serve — the licence determines who else can hold them.

Arrays ≥50kWp on register · counts from the June 2026 refresh
TerritoryOn registerIn replacement windowStatus
North West1,142233Available
Yorkshire & North East1,388281Available
East & West Midlands1,976402Available
East of England2,204466Available
London & South East1,851388Available
South West & Wales2,467529Available
Scotland903171Available
United Kingdom — national licence11,9312,470By enquiry

Utility-scale assets above the serviceable cap are excluded from sample selection and stated separately on your cover sheet, alongside anything we couldn't place. Counts move with each refresh — including downward.

The arithmetic

One contract pays for it.

A commercial O&M contract on a 500kWp roof array typically runs £2,500–£6,000 a year on a multi-year term. An inverter replacement on the same array is a five-figure job in its own right. An extension on a consented new roof is a fresh install.

If the register hands you one account in a year that you would not otherwise have found, it has paid for itself several times over — and there are hundreds of arrays in every territory that nobody has claimed.

1 won contract > 12 months of the licence. That's the whole business case.

Straight answers

The questions you're already asking.

Where does the data actually come from?

Public sources, all named on the record: DNO Embedded Capacity Registers, accreditation registers, local authority planning files and Companies House. You could assemble it yourself — for one array, in about an hour. We do it for every array in your territory, cross-referenced, graded and refreshed, with the source cited on every field so you can check our working.

How do you know the inverter is due if you've never been on the roof?

We don't, and the record says so. What we know is the accreditation date, the capacity, the mounting method and the resulting likely inverter class — all cited — and what design life implies from those. That's labelled a predicted signal, with a missing-evidence line stating plainly that a private replacement would leave no public trace.

What that gets you is a call with a specific, checkable opening rather than a cold one. Records where we can prove an event — consent, charge, ownership change, published notice — are graded above the age-based ones, deliberately.

Two sources disagree on capacity. Which do you use?

Both. The grid register figure and the declared figure are shown side by side with the percentage delta, and the match is labelled high-confidence rather than confirmed, with the join rule and its tolerance printed. Quietly picking one and presenting it as fact is how a register loses an argument on site.

How current is it?

Grid registers are re-ingested monthly as each operator publishes; filings and planning decisions are swept weekly. Your territory feed carries the changes, flagged for action. After a complete source walk, records no longer present are pruned rather than left to decay — so counts sometimes go down, and we tell you when they do.

What does it cost?

Territory licences start at £499 a month on a six-month minimum term. The price for your patch depends on its size — assets on register and live service windows within it — and is quoted with your sample pack, so you see what you're buying first. National licences by enquiry.

What about GDPR?

The register holds site- and company-level data: operators, addresses, assets, capacities and dates, drawn from public statutory sources. It does not ship personal contact data. Who to ring at the operator is your craft; which operators to ring, and when, is ours.

Free territory sample

See your patch first.

A sample pack for your territory within two working days: one record fully open — check every field against its cited sources yourself — the surrounding records with operators sealed, and a cover sheet stating your territory's universe, qualified count, monitoring queue and repair queue. Full records come with the licence, and the licence goes to one firm.

We use your details to send the sample and follow up once. Nothing else, no list.